westway asphalt
Schools · London

School and playground surfacing in London

We resurface playgrounds, school car parks, paths and court areas across London, planned around the school year. Most work is done in the holidays, with the site fenced off from pupils if anything has to happen in term time.

New tarmac entrance path with concrete kerb edging
Tarmac entrance path with concrete kerbs, Oxford.

Get a free quote

Step 1 of 3
What needs surfacing?
  • £10m public liability insurance
  • Our own hand-lay and machine-lay crews
  • CSCS-carded team
  • 40 years in the trade
What we surface

School surfacing we carry out

Playgrounds

New playgrounds and resurfacing of old ones, laid smooth and to falls so they drain.

Car parks and drop-off areas

Staff parking, drop-off loops and service yards, with line marking.

Paths and entrances

Footpaths, ramps and entrance areas, edged with kerbs or timber.

Court and games area bases

Porous asphalt bases for tennis courts and multi-use games areas.

Planning

Working around the school year

Surfacing makes noise and needs lorries on site, so timing and separation matter more at a school than anywhere else.

  • We programme the work for the summer holiday, Easter or half-term, and book it early
  • The work area is fenced off from pupils, with a separate route in for lorries and plant
  • Deliveries and machine movements are kept away from the start and end of the day where term-time work can't be avoided
  • A named contact for the school business manager or site team throughout
Playgrounds

What makes a good playground surface

A smooth, closed surface

A dense 6 mm surface course that is comfortable to play on and easy to sweep.

Falls to drains

Laid to gentle falls towards gullies or channels, so water doesn't sit and freeze.

Ready for markings

A clean, even surface for playground games markings to go on.

Not under play equipment

Areas under climbing frames and swings need an impact-absorbing surface, not asphalt. We leave those to a specialist and tie our surface in around them.

Repair or rebuild

Resurfacing or rebuilding a playground

If the playground is worn and loose on top but still level and draining, a new surface course over the old one is quick and good value, and can often be done in a half-term.

If it has sunk, cracked right through, or holds puddles after rain, the base has failed. Those areas need digging out and rebuilding on a new sub-base, which usually needs the summer holiday. We test the base at the survey so you know which you are paying for.

Case study

Dove House School, Basingstoke

A 1,000 m² area dug out in full, rebuilt on a new sub-base, edged and surfaced in tarmac.

  • Area: 1,000 m²
  • Full dig-out and new sub-base
  • New edgings
  • Tarmac surface
See all projects
Tarmac path between new concrete kerbs
Costs

Playground resurfacing costs

Every school job is priced from a survey, with an itemised quote that can go to governors or the trust. What moves the price:

  • The area, and resurfacing or full rebuild
  • Drainage and any sunken areas
  • Edging and kerbs
  • Access for lorries and machines
  • Holiday or out-of-hours working
How it works

From first call to fresh surface

01

Tell us about the job

Takes a minute online, or call us. Photos help if you have them.

02

We visit and measure

We check levels, drainage and what is underneath before we price anything.

03

You get a written quote

Itemised, showing the area, the build-up and what is included.

04

We lay it

Dig-out, sub-base, binder and surface course, rolled and edged. Then we clear the site.

Start with step one
Questions

School and playground surfacing questions

When can you resurface a school playground?

Usually in the summer holidays, or at Easter or half-term for smaller areas. Summer slots fill early, so it is worth getting a quote in the spring term.

Can the work be done during term time?

Sometimes, for car parks and areas the pupils don't use. The work area is fenced off and deliveries are timed away from drop-off and pick-up.

Can asphalt go under play equipment?

No. Areas under equipment with a fall height need an impact-absorbing surface such as wetpour or rubber. We surface the rest of the playground and finish neatly up to it.

How do you stop puddles on a playground?

By setting gentle falls to gullies or channel drains before the asphalt goes down. Most ponding on old playgrounds comes from a base that has sunk, so we fix that first.

How much does playground resurfacing cost?

It depends on the area, whether it needs a full dig-out, drainage and access. We give an itemised quote that can go to governors or the trust.

Areas

School surfacing across London

We work for schools, academies and nurseries in every London borough.

All areas

Related services

Get a price for your school

Tell us what needs surfacing and when you would like it done. We will survey and send an itemised quote.

Get my free quote
Get a free quote