Padel court bases and sports court surfacing in London
We build porous asphalt bases for padel and tennis courts, for court builders and for clubs and schools direct. Each base is dug out, built on free-draining stone and laid in two layers of porous asphalt, flat and ready for the court on top.

- £10m public liability insurance
- Our own hand-lay and machine-lay crews
- CSCS-carded team
- 40 years in the trade
What's included in a court base
Excavation and formation
Dig-out to level, soft spots replaced and the formation trimmed and compacted to the court builder's levels.
Free-draining sub-base
Clean, open-graded stone that drains and won't heave in frost, laid and compacted in layers.
Two-layer porous asphalt
A binder course and a fine surface course, machine- or hand-laid to tight tolerances.
Levels and falls
Laid flat or to a gentle fall, checked with a straightedge before we hand over.
Ready for the court builder
Handed over clean and level, ready for the ring beam, enclosure and turf or colour coat.
Courts under canopies
Laid inside canopies and enclosed structures, as at Club Langley.
Padel and tennis court base specification
We build to LTA guidance and the SAPCA codes of practice, or to the court builder's own specification where it differs.
| Padel court base | Porous asphalt tennis court | |
|---|---|---|
| Sub-base | Free-draining, frost-resistant stone, about 250 mm deep on average | Permeable stone foundation, at least 150 mm compacted |
| Asphalt | 65 mm of porous asphalt in two layers | 40 mm open-graded binder course plus a 25 mm, 6 mm surface course |
| Falls | Flat, or a fall of no more than 1 in 100 | Set to the design falls |
| Finished by | Court builder: ring beam, enclosure and sand-dressed turf | Colour coat, line marking, posts and fencing |
Summary of LTA guidance. Final depths depend on the ground and the court builder's design.
Working with padel and tennis court builders
Most of our court work is for the companies that build and finish the courts. Getting the base right is what lets their part go smoothly.
- We work to your drawings, levels and programme, as your groundworks and surfacing subcontractor
- Levels set out and checked with you before the asphalt goes down
- Straightedge checks across the finished base, recorded for your handover
- Crew sized for the job, from one court to a multi-court club
- Clubs and schools can also hire us directly for the base, with the court builder brought in for the rest
Four padel court bases at Club Langley, Beckenham
Four porous asphalt padel court bases for Lofthouse Padel at Club Langley, laid under a canopy and rolled to level, ready for the enclosures and turf.
- Client: Lofthouse Padel
- Four courts, under a canopy
- Free-draining sub-base and two-layer porous asphalt

Tennis court resurfacing
Porous asphalt is the most common tennis court surface in the UK. Where an old court still drains and hasn't heaved, we can lay a new surface course over it, ready for colour coating and lines. Where it ponds, cracks right through or has lifted, we rebuild the base.
From first call to fresh surface
Tell us about the job
Takes a minute online, or call us. Photos help if you have them.
We visit and measure
We check levels, drainage and what is underneath before we price anything.
You get a written quote
Itemised, showing the area, the build-up and what is included.
We lay it
Dig-out, sub-base, binder and surface course, rolled and edged. Then we clear the site.
Padel and tennis court base questions
What base does a padel court need?
LTA guidance for UK padel courts is a free-draining, frost-resistant stone sub-base about 250 mm deep on average, with 65 mm of porous asphalt above it in two layers. That is the base we build.
How flat does a padel or tennis court base need to be?
Very. LTA guidance for porous asphalt tennis courts allows no more than 8 mm under a 3 metre straightedge on the surface course, and padel bases are laid flat or to a fall of no more than 1 in 100. We check with a straightedge before handing over.
Do you build the whole padel court?
We build the base: excavation, sub-base and porous asphalt. The ring beam, glass and mesh enclosure and the turf are installed by the court builder, and we work to their drawings and programme.
Can you lay a court base under a canopy?
Yes. The four padel court bases at Club Langley in Beckenham were laid under a canopy structure.
Can you resurface an old tennis court?
Often, yes. If the base is sound and drains well, a new porous asphalt surface course can go over the top, ready for colour coating. If it ponds or has heaved, the base needs rebuilding.
Court bases across London and the South
We build padel and tennis court bases across London, and travel further for court builders and multi-court sites.
All areasGet a price for a court base
Send us the drawings or the number of courts and the site. We will price the base and fit your programme.
